Installation of Cone crusher
1. Installation of the cone crusher plant, lifting equipment is needed, in order to install the machines, used for maintenance.
2. Cone crusher foundation plans, the foundation plans for reference, the user can be designed according to specific circumstances.
3. The lower part of the foundation should have enough space for the installation of transportation equipment
4. In order to not damage the foundation, in the upper part of the basis of the shield must cover the pieces owned by the user.
5. Lubrication systems and electrical operation of the location, the user can change position in accordance with specific conditions, but the order may not change.
6. Installation of main frame
(1)Main frame installation, the bolt in the vicinity of the plate with 8-12 group, the iron wedge to adjust its level of support and vertical, in order to rack level degrees circular surface processing as a benchmark measured by the level of its deviation is not greater than 0.1 Mm / m, the degree of vertical rack in the bush as a benchmark by hanging method.
(2) Adjust the main frame fasteners, welding together the plate in order to avoid a rocky ledge.
(3) After all the equipment was finished, begin the second pouring.
(4) To maintain the level of the rack, be able to guarantee a reliable machine, or so easy to wear and impact on local bush axis of dust and water seal device not working properly.